Auckland

Substations

Client: Northpower

2015 - 2016

At Pace Solutions was contracted to Northpower to provide asbestos remediation in various substations throughout the Auckland Region. 

Due to the high electrical hazards associated with these sites, the asbestos remediation was carried out with the use of specialist fire retardant PPE. 

Works involved in these environments include the removal of contaminated soil and debris to be covered with geotextiles, environmental cleaning of delicate electrical plant and switchboards, and encapsulation of contaminated power cables.

Substations-1.jpg

Carters Building

Client: Bodley Construction

March - April 2016

During the redevelopment of the old Carters office at East Tamaki in Auckland, asbestos textured coating was detected on the underside of the first floor slab above the ground floor ceiling grid. 

At Pace Solutions was contracted to remove the textured coating from the underside of the floor slab, spanning approximately 450m2. 

The asbestos removal was undertaken as Class A friable removal and removed under a full polythene enclosure maintained under negative air pressure.